← Back to projects
Corporate Film, Case Study, Social Media

ZEISS × Schütte – From Bottleneck to Success Factor

Kategorie
Corporate Film, Case Study, Social Media
Leistungen
Concept Consulting 3D Shooting Production Postproduction Editing Motion Design

| ✶ Package : Custom (Package F) – editing, postproduction and motion design for a bilingual case study film plus social media snippets.

A measuring machine that works through the night. A customer who needs results in the morning. This film sits in between.

The story

Alfred H. Schütte in Cologne has been building machine tools since 1880, including multi-spindle automatic lathes and 5-axis CNC grinding machines for series production. Before a customer accepts a machine, Schütte has to prove it delivers what was promised.
For a long time, that measurement was the bottleneck: lots of hand-held gauges, lots of interfaces, lots of time. Today a ZEISS PRISMO measures up to 125 features per part – and 60 parts overnight, fully automated, with no one standing next to it.

The agency Storymaker turned this into a case study film for ZEISS metrology. It is part of a series in which ZEISS shows how companies solve their measurement challenges. The Storymaker team shot the film at Schütte in Cologne in February 2026. BILDECHT took over editing and postproduction.

The edit

The film follows a simple arc. In the evening, the metrology technician sets out the parts, starts the measurement, switches off the light and goes home. During the night, the robot arm and the measuring machine work alone in the dark lab. In the morning, the customer walks in, checks the time and asks how much longer it will take – then the measurement report arrives.
In between, Schütte’s technical director and metrology technician explain why automated measurement gives them a competitive edge.

Interviews, voice-over and industrial footage add up to a story with tension and payoff rather than a data sheet. Calm shots of the night measurement play against the time pressure in the morning, while music and sound carry the shift from suspense to relief.

Formats and CI

Besides edit and pacing, the job covered music selection, the soundtrack, titles and lower thirds in ZEISS design, and every version: the main film in German and English (the English version with dubbed interviews), two subtitled social media snippets in 16:9 and 4:5, and a short square clip for Storymaker’s own channels.
Halfway through production, ZEISS switched to a new corporate design. Typeface, titles, lower thirds and logo ending were rebuilt for every version.

You can also read the story on the ZEISS website: Schütte: Setting a new standard for machine acceptance testing.
Storymaker’s long-standing work for ZEISS is shown in their ZEISS case (in German).

Storymaker (concept, direction, shoot, production), Bildecht (editing, postproduction, motion design)

Similar project? Let's talk.

30-minute free strategy call — no sales pressure.

Book a call →